A permit under water law is required if groundwater is to be used, for example for
If you would like to use or extract groundwater, you can submit an online application for a permit under water law or an elevated permit using the form provided here.
Note: If a borehole is to be drilled and/or a well constructed in connection with groundwater extraction, this also requires a permit under water law. You cannot apply for this using the form provided here. Please contact the competent authority.
You can find general information on water law permits under "Applying for a water law permit - general information".
The issued permit does not give rise to any entitlement to the inflow of water in a specific quantity or quality.
No permit is required for the use of groundwater
if this does not lead to any significant adverse effects on the water balance.
The competent authority will decide on a case-by-case basis whether this applies to your proposed groundwater utilisation.
the water authorities:
The competent authority may issue a permit under water law at its discretion (management discretion).
The law also stipulates when a licence cannot be granted.
This is the case if
Apply for a water permit for groundwater extraction in writing or online to the relevant authority. They will examine your application and decide on its authorisation.
Under certain circumstances, groundwater uses of 5,000 cubic metres or more per year require an environmental impact assessment (EIA) or at least a general or site-specific preliminary assessment.
Please contact the authority responsible for your application before submitting your application.
Depending on the content of your application, public participation may be required by law.
none
Please note that the documents you enclose with the applications must be prepared and signed by authorised experts.
Below you will find a list of documents that may be required depending on the project to be applied for and a brief explanation.
Note: Not all of the documents listed are required for every project.
If you are in doubt as to which documents should be included with your individual application, please contact the competent authority.
In individual cases, you must submit further documents on request.
Explanatory report
Site plans
General site plan
Parcel map
Construction drawings
Cadastral documents (with property register)
Needs analysis
Examination of alternatives
Groundwater balancing (with statement on the usable groundwater resources)
Information on water quality (with groundwater analysis)
Documentation of the sampling facility with hydraulic verifications
If you are required to submit hydraulic analyses, you must provide evidence of the hydraulic processes in the watercourses and in the facilities to be constructed/existing facilities caused by the project.
As a rule, this includes the yield of the water catchment, capacity and permeability of the aquifer as well as the range, geometry and extent of a lowering of the groundwater level.
Development drawing with stratigraphic log (if necessary, graphic representation of the strata profile)
Hydrogeological report with water balance
If a hydrogeological report is required, information on the groundwater conditions, the water balance/usable groundwater resources, neighbouring groundwater uses and, if applicable, the location in or near water protection areas is required.
Documents on existing extraction facilities
Expansion plan and list of layers of the existing facility (see planning requirements)
Basic investigation for drinking water
A basic investigation (DIN 2001-1) is carried out to check whether the existing water source is directly suitable for drinking water supply or requires treatment.
The specific scope of the test is determined by the public health department.
The results of the basic examination can also be uploaded under "Information on water quality".
Spring discharge measurements
Measurement to estimate the source yield, for example via volume flow filling time measurement (manual), flow measurement (pipe).
(Partial) exemption from the obligation to connect and use (written confirmation from the municipality)
In many municipalities, there is an obligation to connect to and use the public water supply system in accordance with the municipal statutes. If you wish to deviate from this despite existing municipal infrastructure facilities, a written (partial) exemption from the municipality is required.
Cross-section of the excavation pit
For dewatering measures in the course of construction projects, with details of the extent and depth of the excavation pit, groundwater level, location of planned pump sump and so on.
Subsoil expertise
If a subsoil expertise is required, this provides information on the quality of the soil with regard to its suitability as subsoil and on the foundation and stability of the planned project.
Proof of prohibition of deterioration/objective fulfilment requirement
In accordance with Section 47 (1) of the German Federal Water Act (WHG), you must manage groundwater bodies in such a way that
Use the provisions of the Groundwater Ordinance (GrwV) to assess and categorise the chemical and quantitative status.
You can enquire with the competent authority as to whether you need to submit a detailed "Technical contribution to the Water Framework Directive".
EIA report or application for preliminary EIA assessment (see Annex 1 No. 13 of the EIA Act)
If your planned project is subject to the obligation to carry out an environmental impact assessment (EIA), you must submit an EIA report. The content is set out in Section 16 (1) of the Environmental Impact Assessment Act (UVPG).
The competent authority informs and advises the project developer on the content, scope and level of detail of the information that the project developer is expected to include in the EIA report (scope of investigation in accordance with Section 15 (1) sentence 1 EIA Act).
Whether the project is subject to an EIA is determined in certain cases as part of a preliminary assessment by the authority. Please contact the competent authority for this.
Nature conservation report
If your project is likely to have an impact on nature and the landscape, the information required to assess the impact must be provided, in particular on the location, type, extent and timing of the impact as well as the planned measures to prevent, compensate for and replace the impact and information on the actual and legal availability of the areas required for compensation and replacement.
An accompanying landscape conservation plan illustrates this with text and maps.
To ensure compliance with species protection regulations, it must also be checked whether the project will harm protected animals or plants.
A "special species conservation assessment" (saP) must be carried out for European bird species and species listed in Annex IV of the Habitats Directive.
If your project affects a flora-fauna-habitat area (FFH area), the competent authority must check whether the project will have a significant impact on the area or whether a significant impact is to be expected in a preliminary assessment.
You must provide the necessary documents for this.
You may have to provide further nature conservation documents.
Other documents
Costs (fees) are usually incurred for the granting of a water licence. These are usually based on the economic or other interest in groundwater abstraction/groundwater utilisation as well as the official costs.
The basis for the calculation of fees is the legal ordinance and statutes of the respective competent authority as well as the regulations of the state fee law.
The state of Baden-Württemberg charges a water abstraction fee for the utilisation of groundwater and surface water. Anyone who, among other things, extracts, extracts, discharges or discharges groundwater is liable to pay the fee. The extracted water must be used for water supply, i.e. to meet water requirements, for example as drinking water, process water, domestic water, cooling water or extinguishing water.
There is an obligation to pay for groundwater abstraction
The amount of the fee depends on
The basis for calculating the charge is the amount of water actually withdrawn, which is usually recorded using appropriate measuring devices (e.g. a water meter).
Groundwater abstraction for the purpose of irrigation or sprinkling of agricultural, horticultural and forestry land is exempt from charges.
This includes plant cultivation including ornamental plant cultivation and tree nurseries, viticulture, horticulture and landscaping as well as forestry.
depending on the individual case and the authorities to be involved
If you have any further questions, please contact your local water authority.
Gesetz zur Ordnung des Wasserhaushalts (WHG):
Wassergesetz für Baden-Württemberg (WG):
Gesetz über die Umweltverträglichkeitsprüfung (UVPG):
Umweltverwaltungsgesetz Baden-Württemberg (UVwG):
machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 01.07.2024