Decommissioning of installations requiring authorisation must be reported to the competent authority in accordance with Section 15 (3) of the Federal Immission Control Act (BImSchG) as soon as the operator has decided to do so.
The responsibilities in the area of immission control are regulated in the Immission Control Competence Ordinance of the state of Baden-Württemberg.
In most cases, the competent authority for installations requiring authorisation under immission control legislation is the local lower immission control authority, i.e
A different responsibility applies in the following cases (e.g. for companies that are subject to the European Industrial Emissions Directive, the Hazardous Incident Ordinance or mining law):
Departments 5, Environment of the respective locally responsible regional councils are the competent immission control authorities for company premises on which
exists or is to be constructed.
Department 9, State Office for Geology, Raw Materials and Mining of the Freiburg Regional Council is also the state-wide competent immission control authority for
Please ensure that you submit the decommissioning notification to the immission control authority responsible for your facility.
If you intend to cease operating an installation that requires authorisation under immission control legislation, you must notify the authority responsible for the installation immediately, stating the date of cessation in accordance with Section 15 (3) of the Federal Immission Control Act (BImSchG) Authority responsible for the installation.
When decommissioning a plant that requires authorisation under immission control legislation, you must fulfil the aftercare obligations arising from Section 5 (3) and (4) BImSchG:
You must immediately notify the authority responsible for your installation of the intended decommissioning of an installation requiring authorisation under immission control legislation, together with the necessary documents. The competent authority will check whether the operator obligations have been fulfilled. If further documents are required for an assessment, these must be submitted subsequently.
You must report the decommissioning of installations requiring authorisation as soon as you as the operator have made a decision to do so.
The notification must be accompanied by documents on the planned measures to fulfil the aftercare obligations arising from Section 5 (3) and (4) BImSchG.
Please enquire with the immission control authority responsible for your system.
If the authority responsible for your installation offers an online application for the notification of a change to an installation requiring authorisation under immission control law in accordance with Section 15 (1) BImSchG, you can also use this for the notification of a cessation of operations in accordance with Section 15 (3) BimSchG.
Coordinate in advance with the responsible immission control authority regarding the documents required for an assessment.
Please make sure that you submit the notification to the immission control authority responsible for your plant requiring authorisation under immission control law.
Bundes-Immissionsschutzgesetz (BImSchG):
machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 18.02.2025
Stadt Kuppenheim
Friedensplatz
76456 Kuppenheim
Telefon: 07222/9462-0
Telefax: 07222/9462-150
stadt@kuppenheim.de