Companies and private individuals require a licence under water law if they, for example
The authorisation specifies the type and extent of use and is limited in time. It may be subject to conditions and ancillary provisions. In certain cases, it can be revoked.
An authorisation under water law can be issued as a permit, higher-level permit or authorisation.
A higher authorisation can be grantedif there is a public interest in thiseinterest or a legitimate interest of the water user bestands.
In special individual cases, a permit under water law can also be issued for the project.
You require a permit for the following water uses, for example:
Other types of use that require a permit are set out in Section 9 (2) of the Water Resources Management Act (WHG) and Section 14 of the Baden-Württemberg Water Act (WG).
No authorisation is required if the use is covered by public use.
However, these are only uses that are not very intensive and are usually traditionally permitted. These include, for example, bathing, travelling with small unpowered boats and watering animals.
Regulations on public use are specified in Sections 20 and 21 WG.
The lower water authority is generally responsible:
The regional councils as higher water authorities are responsible for utilisation in accordance with Section 82 (2) and (3) of the Baden-Württemberg Water Act.
A permit under water law is granted by the competent authority at its discretion (management discretion).
The law also stipulates when a licence cannot be granted.
This is the case if unavoidable, harmful changes to water bodies are to be expected or other requirements under public law are not met.
For example, a permit for the discharge of wastewater into bodies of water (direct discharge) requires, among other things, that the pollutant load of the wastewater is as low as possible according to the state of the art.
Apply in writing to the competent authority for a water licence. It will examine your application and decide on the authorisation.
Under certain circumstances, an environmental impact assessment (EIA) must be carried out for your project or at least a general or site-specific preliminary environmental impact assessment.
Please contact the authority responsible for your application before submitting it.
Depending on the content of your application, public participation may be required by law.
none
The documents required depend on the type of project applied for.
In any case, an explanatory report and informative site plans are required.
For example, the documents listed below are usually required for a discharge authorisation for a wastewater treatment plant. In individual cases, however, further documents may be required by the competent authority:
Note: In individual cases, further documents must be submitted on request.
depending on the fee schedule of the competent authority
depending on the type of water utilisation applied for for the permit
If you have any further questions, please contact your local water authority directly.
Gesetz zur Ordnung des Wasserhaushalts (WHG)
Wassergesetz für Baden-Württemberg (WG)
Gesetz über die Umweltverträglichkeitsprüfung (UVPG)
Umweltverwaltungsgesetz Baden-Württemberg (UVwG)
machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 18.07.2024
Stadt Kuppenheim
Friedensplatz
76456 Kuppenheim
Telefon: 07222/9462-0
Telefax: 07222/9462-150
stadt@kuppenheim.de